Customization: | Available |
---|---|
Warranty: | 1 Year |
Brand: | Poweronly |
Suppliers with verified business licenses
Controll Function | ||
Controll Function | Protection Function Data display | Protection Function Data display |
Emergency Stop | Low-Lub oil pressure | Speed |
Manual Start/stop | Charge Failure | Voltage of battery |
Distance Start/Stop | Emergency STOP | Lub Oil pressure |
Preheat Control | High temperature of cooling water | Operation time |
Stop/idle control | High Speed/Start and stop failure | Voltage/Current |
How to choose a suitable Generator Controller | ||||||
Replaced type made in china | ||||||
701AS/MS | 702/AS/MS | 703 | 704 | 705 | 710 | 720 |
501K | 520 | 5110/5120 | 5210/5220 | 6120/6110 | 7210/7220 | 7310/7320 |
Economic type(low cost &small output) | ||||||
DSE3110 | DSE 4520 | DSE 4620 | 501k | 701AS/MS | 702AS/MS | 704 |
More Functions(Big output) | ||||||
5110/5120 | 5210/5220 | DSE6010/ DSE6020 |
6120/6110 | 7210/7220 | 7310/7320 | DSE7410/ DSE7420 |
Multi-languages Englines,Spanish,Portuguese,French,German,Russian,Thai,Arabic,Chinese |
||||||
DSE7410/ DSE7420 |
DSE6010/ DSE6020 |
6120/6110 | 7210/7220 | 7310/7320 | ||
DSE 704 | DSE 720 | DSE 5220 | DSE6120 | DSE 7220 | DSE 7320 | DSE5120 |
Synchronising and Load Share DSE Controller | ||||||
DSE 8610 | DSE 8620 | DSE 8660 | ||||
Canbus ECU Communications Generator Controller | ||||||
DSE 3110 | DSE 4520 | DSE7110/ DSE7120 |
7210/7220 | 7310/7320 | DSE7410/ DSE7420 |
DSE 8610 |
1. Are you a manufacturer? If yes, where is your factory?
Yes, we are manufacturer. Our factory and headquarters are located in Fujian, Ningde, Fuan.
2. What can I buy from you?
Complete sets of distribution boxes, distribution panels, control panels, control boxes, power supply cabinets, electrical cabinets, etc. We have 15 years of experience in the electrical automation industry and are committed to providing customers with high and low voltage electrical control cabinets, distribution cabinets, explosion-proof cabinets, etc.
3. How long does it take to get a quote? What is the lead time?
After receiving the details, we will give you a quotation within 2 days. Generally speaking, it takes about 15 days for samples and about 26 days for mass production. The specific delivery time depends on the items and quantity of your order.
4. What are your payment terms?
We accept any flexible and fast payment method. Irrevocable letter of credit at sight.Pay 30% in advance as deposit + 70% of the balance after the goods are ready (support T/T, Paypal, Apple Pay, Google Pay, Western Union, WeChat, etc.)
5. Do you have an overseas technical team?
Yes, if you need it, our technical team can go to the site to guide installation, testing, debugging, maintenance, etc., and we can discuss it in detail.